1.Chassis parameters: The chassis adopts the Dongfeng original second-class chassis, equipped with Cummins 2101230 horsepower, wheelbase 4700mm, national six emission standard, with intercooling supercharging, ABS anti-lock system, direction power, air conditioning, electric doors and Windows,...
The chassis adopts the Dongfeng original second-class chassis, equipped with Cummins 2101230 horsepower, wheelbase 4700mm, national six emission standard, with intercooling supercharging, ABS anti-lock system, direction power, air conditioning, electric doors and Windows, remote control key 1000R20 steel wire tire, air brake brake, new interior.
Suction part :9 square tank, tank body 6mmQ235 high quality carbon steel plate, equipped with Zibo SK-15(optional 2BE-204) water circulation pump suction, 10 meters suction pipe, air inlet pipe plus flow net, true anti-overflow valve, back cover clip lock, looking forward pollution measuring pipe, The rear end is equipped with a Rio Tinto 100mm suction port ball valve and 150mm sewage outlet. The tank body is equipped with lifting function, the rear door is equipped with hydraulic opening, and the 360-degree rotatable boom seat is convenient for remote control operation of the pipe. Cleaning part :6 square water tank, using 4mmQ235 high-quality carbon steel plate, water inlet on both sides of the water tank fire interface, a toolbox. The use of Germany Pinfu 215 flow high pressure pump, with 60 meters of inner diameter 19# high pressure pipe, 10 different sizes of nozzle sleeves, post-cleaning coil, with shower pipe device (used to wash the high pressure pipe dredging the pipe after the above dirt), Water blowing function with air (used to blow out the residual water stains inside the high-pressure pipe after each work, to prevent cold freezing affecting the next use)